Guide

What a job shop needs on your drawing before it can quote

A quote is a shop's commitment to make the part on the drawing for a price. When the drawing leaves something out, the shop either asks, which costs days, or assumes, which costs you the part. The fields below are what an estimator reads first on a machined or fabricated part. None of them is exotic; most missing-field questions on Amerigo are about quantity, material grade and finish.

Send a drawing

Updated October 8, 2026

The fields every quote needs

FieldWhat to writeWhat happens if it is missing
QuantityThe number for this order, and the yearly or repeat volume if anyThe shop quotes one quantity and you cannot compare; setup is spread over the count
MaterialAlloy and temper or grade: 6061-T6, 304 2B, A36, 1018 CRSA question, or the shop's default alloy
Stock formPlate, sheet gauge, bar size, tube wall, where it mattersThe shop picks; cost and flatness follow the choice
TolerancesA title block default plus the few features that need tighterEverything quoted to the default; tight features found at inspection
FinishProcess, color, spec, thickness, and what stays bareQuoted as bare, or with an assumed finish
Threads and insertsThread callout, depth, class; PEM part numbers and sideTapped holes cut to a guessed class; hardware left out
WeldingWeld symbols or a weld class note, and whether it is structural or cosmeticThe shop picks a weld size and finish
Date neededA real date, or noneQuoted to the shop's standard lead time
Ship-toCity and state, and dock or liftgateFreight cannot be estimated; the quote assumes pickup at the shop

Tolerances: the title block and the few that matter

A title block default such as two-place plus or minus 0.010 and three-place plus or minus 0.005 covers most of the part. Put the tighter tolerances on the features that need them: a bore for a bearing, a dowel hole pattern, a flatness callout on a mounting face. A drawing with a tight default on every dimension prices every dimension as tight, and the quote goes up for no gain.

Give geometric tolerances only where they matter and only with a datum scheme the shop can inspect to. A position callout without datums is a question.

Files: PDF first, STEP when there is a shape

The PDF drawing is the contract: it carries material, tolerances, finish and notes. A STEP file removes the back and forth on bends, contours and hole positions, and lets the shop program from the model. Send both when you have both. A DXF is only useful for flat parts cut from sheet; a STL is not a manufacturing file for machined or fabricated parts.

Name the files with the part number and revision, and put the revision on the drawing. A quote is tied to a revision; a drawing that changes after the quote changes the price.

Sending a package of parts

Machine builders usually need a dozen part numbers at once. Send them as one request with every drawing and model attached and the quantity per part number. A shop quotes the package, flags the parts it would rather send elsewhere (a sheet metal cover inside a machining package, a weldment inside a sheet metal package), and you get one set of prices to compare. If some parts are needed ahead of the rest, say which.

The questions you will be asked anyway

  • Is this a one-time build or a repeating part? Repeating parts get fixtures and better unit prices.
  • Do you want a first-article inspection report, and to what level? It is a line on the quote if you do.
  • Do you supply material or does the shop? Default is the shop sources it.
  • Is any of it export controlled? A controlled drawing is routed only to shops authorized for it, and Amerigo asks before anything is sent.

Questions buyers ask

Do I need a formal drawing, or is a model enough?
For a quote, a PDF with material, finish, quantity and the tolerances that matter is enough even if it is a dimensioned screenshot. For an order, the shop makes the part to the drawing, so the drawing has to say everything the part must be.
What if I do not know the material?
Say what the part does and where it lives (indoors, wash-down, outdoors, food contact) and the shop will propose one on the quote. The quote names the material; nothing is assumed silently.
How does Amerigo read my drawing?
When you attach a drawing, Amerigo reads it and lists the open questions a shop would ask, so you can answer them before the request goes out. It never fills in a number the drawing does not carry.

About Amerigo. Amerigo is the sourcing network for American manufacturing. More about Amerigo